Requirements:

The scope called for a pipe protective coating system with outstanding chemical resistance and high abrasive resistance when backfilled.

Solution:

The pipe was abrasive blasted to SP 5 / NACE No.2 near white blast and coated with Chemclad - an epoxy with outstanding chemical resistance.  The pipe joins were reinforced with the Denso Tape system to provide a high level of corrosion resistance.  The finished coating / tape system was then protected with Denso Rockmesh prior to backfilling.

Project Details:

  • Date: March 2016
  • Customer: Local Government
  • Location: Wollongong
  • Contractor: Specialised Industrial Maintanence